Skip to main content

Homeguard blue sheets before timber framing

By Admin
on 03 May 2016 8:19 PM

The following picture shows the Homeguard blue sheets are installed to the edge of the slab as part B treatment. The Part B Termites Treatment is applied before timber framing.

In Part B of termites protection and treatment, additional chemical and/or physical products will be used around the perimeter of the house at varying stages during the building process.

HomeGuard is a Precision Subterranean Termite Management System which is a physical and chemical subterranean barrier in one. It is installed on the foundations of new buildings or extensions to provide a continuous barrier, which prevents concealed termite entry. The products repel, kill and block foraging subterranean termites, providing ongoing protection.

This job is done by Best Termites ControlFor more information about Pre-Construction termites protection and treatment, please click here. Best Termites Control company provides professional termites protection and treatment jobs (e.g. Part A and Part B termites treatments) for new constructions and buildings (residential and commercial) in Melbourne and all suburbs including Dandenong, Doncaster, Glen Waverley and Rowville. If you need more details or want a termite treatment cost estimate and quote, please contact us here or call free on 1800 780 820.

Leave a Comment